SULPHUR LOADING TERMINAL CONSTRUCTION
Scope of Work
- Manpower: Over 3,000 personnel
- Earthworks: 627,000 cube m.
- Surface coating: 620,000 square m.
- Concrete: 50,000 cube m.
- Steel structures: 6,000 tons
- Industrial Pipeline: available
- Pumps and compressors: 50 units
- Vessels and tanks: 147 units
- Painting works: 40,000 square m.
- Insulation: 30,000 square m.
- Electrical cabling: 937 km
- High-tech cable trays: 32 km
- UPS and instrumentation: 4,621
- Transformers: 30 units
- Distribution panels: 342 units
- Multi-core cabling: 662 km
INSTRUMENTATION AND CONTROL (L&C)
- Distribution panels: 342 units
- Multi-core cabling: 662 km
- Pneumatic control circuits: 3,776 units
- Junction boxes: 3,000 units
- Measurement and control devices: 4,206 units
- Fiber-optic cabling: 93,679 m
- Cable trays: 17 km
- Data center: 1 unit
PIPING INSTALLATION
- Carbon steel piping: 69 km
- Stainless steel piping: 2.4 km
- Jacketed piping: 3.5 km
- Inline components: 1,524 units
- Insulation: 26,000 square m.
MECHANICAL WORKS
- Vertical and horizontal vessels: 27 units
- Air coolers : 21 units
- Boilers, cable ducts, and ventilation channels : 2 units
- Pumps and compressors : 51 units
- Equipment packages : 74 units
- Specialized components : 65 units
- Field-erected tanks : 8 units
ELECTRICAL WORKS
- Electrical cabling: 937 km
- High-tech cable trays: 32 km
- UPS and equipment: 4,621 units
- Transformers: 30 units
- Electrical trace heating: 39 km