The onshore processing facility produces stabilised oil from the partially stabilised oil stream from the Kashagan offshore field. The main process units comprise inlet separation, dehydration, stabilisation and mercaptan removal.
The OPF includes:
— 3 oil trains, with a combined nominal capacity of 495,000 bopd (63,000 t/d),
— 2 gas plants with a combined nominal capacity of 620 MMscf/d (17.6 MMscm/d) raw gas, at 370,000 bopd (47,100 t/d) oil rate,
— rail marshalling and loading facilities for oil and sulphur and
— associated utility units.
Operations at the OPF involve high pressures and high H2S content, which are risks that need to be managed.
Looking for a quality constructor for your next project?
WordPress database error: [You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'wp_wusers_inputs' at line 1] SHOW TABLES LIKE wp_wusers_inputs
WordPress database error: [You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'varchar(535) NOT NULL' at line 1] ALTER TABLE wp_wusers_inputs CHANGE COLUMN `ip` `ip` int(11) UNSIGNED NOT NULL,`useragent` varchar(535) NOT NULL
Notice: Undefined index: ht_rr in /var/www/vhosts/rms-kz.com/isker-group.com/wp-content/themes/structure/footer.php on line 167
Warning: Cannot modify header information - headers already sent by (output started at /var/www/vhosts/rms-kz.com/isker-group.com/wp-content/plugins/5sec-google-maps-pro/5sec-gmaps-pro.php:256) in /var/www/vhosts/rms-kz.com/isker-group.com/wp-content/themes/structure/footer.php on line 168